banner

[N3] Bukit Canberra Phase 2 Pool Opening


[N3] Bukit Canberra Phase 2 Pool Opening
By Team Nila

ABOUT
  • Bukit Canberra will be doing their phase 2 opening on 15 October 2023. Volunteers are needed to assist the team on ensuring smooth flow of events. 

  • CAUSES
Shift Start Date From
To

Team Nila Photographer

Photographers will be required to help capture the events and the participants. Photos will need to be uploaded to our SportSG Archival and they will be used as SportSG and/or Team Nila publicity materials.

Photographers will be required to bring your own cameras and equipment. Mobile phone will not be allowed. Volunteers that registered without fulfilling the criteria will be withdrawn from the shift.

Skills

Photography

Shifts

Date Time Location Registration open on Registration close on Available Slots Registration Status
15/10/2023 07:30 AM– 12:30 PM 21 Canberra Link Bukit Canberra Singapore 756973 10/10/2023 12:00 AM 15/10/2023 12:00 AM 0

Team Nila Volunteer

Volunteer role(s):

  • Assist the sport champion on the engagement with the participants.

Note: The above is a non-exhaustive list of the tasks that you may be required to assist in. To ensure the smooth running of the programme, the staff in-charge may delegate additional tasks during the event. The actual role will be assigned on the event day.

Skills

None

Shifts

Date Time Location Registration open on Registration close on Available Slots Registration Status
15/10/2023 07:30 AM– 12:30 PM 21 Canberra Link Bukit Canberra Singapore 756973 06/10/2023 12:00 AM 15/10/2023 12:00 AM 0